Home / MOQ, pricing and lead times

Minimums · prices · lead times

MOQ, pricing and lead times for US clothing production

We are a group of US clothing factories and make clothing from 100 pieces per style in every product family (socks from 100 pairs). Samples take 2–4 weeks, bulk 4–6 weeks after you sign off the sample, and a first order runs 8–12 weeks from brief to delivery. The tech pack is the one fixed price: $89 per style.

Wall of colourful thread cones above wooden cutting tables
Cutting room, USA
Minimum
100 piecesper style
Sampling
2–4 weeks
Bulk
4–6 weeksafter sample sign-off
Tech pack
$89per style

Minimums

What is the minimum order?

Every product family starts at 100 pieces per style. Sizes can be split inside the style; tell us your colours in the brief and we confirm the minimum per colour.

Minimum order by product
ProductMinimumWhere in the US
T-shirts and knits100 pieces per styleLos Angeles, the Carolinas
Hoodies and fleece100 pieces per styleThe Carolinas, Los Angeles
Denim100 pieces per styleLos Angeles
Activewear100 pieces per styleLos Angeles, the Carolinas
Dresses and wovens100 pieces per styleNew York Garment District
Outerwear100 pieces per styleMatched to the product
Socks100 pairs per styleThe Carolinas
Uniforms and workwear100 pieces per style (reorders: with the quote)Matched to the product

Price

What drives the price per piece

Part of every run is a fixed cost: the pattern, the marker, setting up cutting and the sewing line cost the same for 100 or 500 pieces. More pieces per style spread that cost, so the unit price falls.

What moves the price

  • Fabric: US-knit or imported, weight and fiber
  • Construction: panels, seams, linings, zips and pockets
  • Decoration: print, embroidery, dye or wash
  • Labels and packing: woven labels, hang tags, polybags
  • Quantity and date: bigger runs and relaxed dates cost less

Example estimate

A zip hoodie in US-knit fleece, 300 units, made in Los Angeles: about $18–35 per unit cut, make and trim, fabric priced separately. An illustration of a calculator result, not a quote.

Development costs

What you pay before bulk

Development costs
StepPriceNotes
Production briefFreeWe reply within 24 hours
Tech pack$89 per style3–5 working days, 2–3 revision rounds
Pattern, grading, 3D sample (CLO3D)Quoted with your tech packIn writing, before any work
Sample and bulkWritten quotePrice per piece, minimum and timing

Secure Stripe checkout. All purchases are final.

Lead times

How long does US production take?

Lead times
StepTime
Reply to your brief24 hours
Tech pack, if needed3–5 working days
Sample2–4 weeks
Bulk4–6 weeks after sample sign-off
Ground shipping, lower 481–5 days
First order, brief to delivery8–12 weeks

Reorders run shorter, because the pattern and the approved sample already exist.

Getting an exact quote

What to send with your brief

  • The product: a sketch, photo, reference garment or tech pack
  • Fabric you have in mind (fiber and weight, if you know)
  • Units per style, colour and size
  • Print, embroidery, labels and packing
  • The date you need the goods and where they ship

FAQ

MOQ, price and timing questions

Question not covered? Email oneaimapparel@gmail.com with your product and quantity. We reply within 24 hours.

01What is the minimum order for US clothing production?

From 100 pieces per style in every product family, denim and activewear included. Socks start at 100 pairs per style.

02How much does it cost to make clothing in the USA?

It depends on fabric, construction and quantity. As an illustration, a zip hoodie in US-knit fleece, 300 units in Los Angeles, estimates at about $18–35 per unit cut, make and trim, with fabric priced separately. Your written quote comes from the tech pack.

03How long does a first order take?

8–12 weeks from brief to delivery: samples in 2–4 weeks, bulk in 4–6 weeks after sample sign-off, then 1–5 days by ground to the lower 48.

04How much is a tech pack?

$89 per style, delivered in 3–5 working days with 2–3 revision rounds. Pattern making, grading and a 3D sample are quoted with your tech pack.

05Do I pay import duty?

No import duty on the finished garments, because they are made in the USA and ship by ground. Imported fabric can carry duty, which is part of the fabric price.

06Do I pay anything before I accept a quote?

No. The brief is free and the quote for sampling and bulk comes in writing before any work starts. The tech pack is the only fixed-price item.

Tell us what you are making

One brief, from 100 pieces per style, made in the USA. Sending it is free and we reply within 24 hours.

Sewing operator joining red knit panels at a machine on a busy sewing floor