The Berry Amendment is the federal law that stops the Department of Defense from spending its funds on clothing, fabrics, fibres and certain other items that were not grown, reprocessed, reused or produced in the United States. It now sits at 10 U.S.C. 4862, and the Defense Federal Acquisition Regulation Supplement (DFARS) puts it into contracts through clause 252.225-7012. For apparel, it reaches past the finished garment to the materials and components inside it.
Many guides still cite the old section number, an old dollar figure, or a change that never became law. This explainer works from the official text as it reads in November 2026: what is covered, who it binds, the small-purchase figures, the exceptions, and how it differs from Buy American, the Kissell Amendment and Made in USA labelling.
Not legal advice. This is a plain-English summary of public statutes and regulations. Your obligations come from the clauses in your own solicitation and contract, so check the contract clause and ask your contracting officer or counsel before you bid.
The short list
- Current citation: 10 U.S.C. 4862. It was renumbered from section 2533a by Pub. L. 116-283, effective 1 January 2022.
- DoD only: the statute restricts funds available to the Department of Defense. The Department of Homeland Security has its own, narrower rule at 6 U.S.C. 453b.
- Materials and components count: clothing is covered together with "the materials and components thereof", and synthetic fabric includes its fibres and yarns.
- Two dollar figures: the statute exempts purchases up to $150,000; the DFARS exception has read $200,000 since an inflation adjustment effective 1 October 2025.
- The FY2026 NDAA did not remove the small-purchase exception. Its Berry section dealt with seafood; a separate section ordered work on the domestic textile and footwear base.
What is the Berry Amendment?
The core sentence is short. Under 10 U.S.C. 4862(a), funds appropriated or otherwise available to the Department of Defense "may not be used for the procurement of an item described in subsection (b) if the item is not grown, reprocessed, reused, or produced in the United States." The statutory notes add that the section "is popularly known as the Berry Amendment".
It is a restriction, not a price preference. A covered item from abroad is not marked up in the evaluation and allowed to compete; unless an exception applies, it cannot be bought with those funds at all. That is the single most useful thing to understand before you read anything else about it.
The rule is old. The Congressional Research Service traces it to the FY1941 Fifth Supplemental National Defense Appropriations Act, enacted on April 5, 1941, when Congress wanted to protect the US industrial base in wartime. For decades it was renewed in appropriations acts. The FY2002 National Defense Authorization Act, Pub. L. 107-107, wrote it into Title 10 as section 2533a.
Which section applies now, 2533a or 4862?
Cite 10 U.S.C. 4862. Pub. L. 116-283, enacted on 1 January 2021, renumbered section 2533a as section 4862 as part of a wider reorganisation of defense acquisition law, and that renumbering took effect on 1 January 2022. The DFARS now opens its Berry rules with the words "The following restrictions implement 10 U.S.C. 4862 (the Berry Amendment)".
Supplier letters, older checklists and many web pages still say 2533a. The substance carried over, so an old citation is not a legal problem in itself. It is a useful signal, though: a compliance statement that still cites 2533a has probably not been reviewed in years, and it is worth asking when it was last checked against the current clause.
There are three layers to read together. The statute (10 U.S.C. 4862) sets the rule. DFARS 225.7002-1 and 225.7002-2 tell DoD buyers what they may not acquire and which exceptions exist. DFARS 252.225-7012, "Preference for Certain Domestic Commodities", is the clause that lands in your solicitation and contract, and DFARS 225.7002-3 tells contracting officers to use it, including for commercial products bought under FAR part 12.
What the Berry Amendment covers
Section 4862(b) lists the covered items. For anyone in apparel and textiles, the important lines are:
- Clothing "and the materials and components thereof", other than sensors, electronics or other items added to, and not normally associated with, clothing.
- Tents and their structural components, tarpaulins, and covers.
- Cotton and other natural fiber products, woven silk or woven silk blends, spun silk yarn for cartridge cloth, synthetic fabric or coated synthetic fabric "including all textile fibers and yarns that are for use in such fabrics", canvas products, and wool "whether in the form of fiber or yarn or contained in fabrics, materials, or manufactured articles".
- Individual equipment manufactured from or containing those fibres, yarns, fabrics or materials.
The same subsection also covers food, hand or measuring tools, and a flag of the United States, which Pub. L. 118-31 added in December 2023. Stainless steel flatware and dinnerware were added back by Pub. L. 118-159 from 1 January 2026, and the same law repeals those two lines with effect from 1 January 2029.
The DFARS spells out what "clothing" means in practice. DFARS 225.7002-1(a)(1)(ii) says clothing "includes items such as outerwear, headwear, underwear, nightwear, footwear, hosiery, handwear, belts, badges, and insignia." Individual equipment is identified as Product or Service Code 8465. So a DoD buy of socks, caps, gloves, belts or embroidered insignia is a Berry buy in the same way as a uniform jacket.
Why materials and components matter
The clause does not stop at the finished garment. DFARS 252.225-7012(b) says the contractor "shall deliver under this contract only such of the following items, either as end products or components, that have been grown, reprocessed, reused, or produced in the United States". The clause defines a component as "any item supplied to the Government as part of an end product or of another component."
Put that next to the statutory wording and the practical reach becomes clear. Clothing is covered with its materials and components. Synthetic fabric is covered with its fibres and yarns. Wool is covered as fibre, as yarn and inside fabrics. The Congressional Research Service summarised the difference from Buy American as the Berry Amendment requiring "that items be 100% domestic in origin."
For a woven uniform shirt, that puts the fibre, the yarn, the fabric, and the cut and sewn garment all in scope, along with the trims that go into it unless a specific exception covers them. A US sewing floor working with imported fabric does not turn the garment into a US-origin item for Berry purposes, and nor does a US mill weaving imported yarn for a synthetic fabric.
This is also why the Berry question is mostly a supply-chain question rather than a sewing question. Our guide to trims and labels explains why the small components are usually specified last, which is exactly where origin paperwork tends to go missing.
Those federal counts show the scale of the domestic base that covered DoD textile buys rely on. In 2025 the United States had 81,218 private-sector jobs in textile mills, 92,849 in textile product mills, 78,794 in apparel manufacturing and 10,453 in footwear manufacturing, according to the Bureau of Labor Statistics. They are industry-wide totals, not a count of firms doing Berry work.
Who is bound by the Berry Amendment?
Legally, the statute restricts how the Department of Defense spends money. It does not regulate private sales. A garment sold to a retailer, a school or a consumer carries no Berry obligation, however similar it is to a military item.
Contractors are bound through their contracts. When clause 252.225-7012 is in a contract, the contractor promises to deliver only compliant items, as end products or components. Because components count, the inputs a prime buys from mills, trim suppliers and sewing subcontractors are part of what it delivers. Whether and how your own subcontract repeats the clause is a contract question, so read the clause list in your purchase order rather than assuming.
The statute applies to commercial products too. Section 4862(i) makes it applicable to contracts and subcontracts for commercial products "notwithstanding section 1906 of title 41", the section that lists laws inapplicable to procurements of commercial products. For geography, section 4862(j) says "United States" includes the possessions of the United States, and the DFARS clause defines it as "the 50 States, the District of Columbia, and outlying areas."
The stakes of a wrong statement are real. The False Claims Act, 31 U.S.C. 3729, reaches anyone who "knowingly presents, or causes to be presented, a false or fraudulent claim for payment or approval" or knowingly makes a false record or statement material to one. Whether a given mistake rises to that level is a legal question, but it is the reason primes ask for origin records rather than a signed assurance.
The small-purchase exception: $150,000 or $200,000?
Both figures are in force, in different documents. Section 4862(h)(1) of the statute says that, except for purchases of US flags, subsection (a) "does not apply to purchases for amounts not greater than $150,000". The same paragraph forbids dividing a larger procurement "into several purchases or contracts for lesser amounts in order to qualify for this exception."
Section 4862(h)(3) lets the Secretary of Defense adjust that dollar figure for changes in the Consumer Price Index on October 1 of each year evenly divisible by five. DoD did so in a final DFARS rule published in the Federal Register on 25 August 2025 and effective October 1, 2025, which amended DFARS 225.7002-2 in paragraph (a) by removing "$150,000" and adding "$200,000". The DFARS exception now reads: "Acquisitions not exceeding $200,000".
Two details are easy to miss. First, the DFARS carve-out has its own exception: it does not cover athletic footwear purchased by DoD for members of the Army, Navy, Air Force or Marine Corps on their initial entry into the Armed Forces. Second, the fixed dollar figure is fairly recent. Before Pub. L. 116-283 rewrote subsection (h), the exception applied to purchases "not greater than the simplified acquisition threshold". If an article tells you the Berry exception simply follows the simplified acquisition threshold, it is describing the old text.
| Text | What it says | Figure |
|---|---|---|
| 10 U.S.C. 4862(h)(1) | Berry does not apply to purchases up to this amount (not for US flags); no splitting | $150,000 |
| 10 U.S.C. 4862(h)(3) | Secretary of Defense may adjust the figure for CPI every year divisible by five | Adjustable |
| DFARS 225.7002-2(a) | Acquisitions not exceeding this amount are not subject to the restrictions (athletic footwear for new recruits excepted) | $200,000 since 1 October 2025 |
Below the line, the Berry restriction does not apply, but that does not mean anything goes. Other domestic preference rules, such as Buy American, can still apply to a small buy, so the absence of the Berry clause is not a licence to stop checking origin.
What the FY2026 NDAA actually changed
Earlier versions of this article repeated a claim that the FY2026 National Defense Authorization Act would end the small-purchase exception for textiles. The enacted law did not do that. The FY2026 NDAA became Pub. L. 119-60 on 18 December 2025, and the amendment it made to section 4862 was to subsection (g), on seafood.
Section 831 of that law, titled "Applicability of Berry Amendment to procurement of certain seafood", narrowed the commissary and exchange exception so that it does not apply to seafood originating in a covered foreign country, which it defines as China, Russia, Iran and North Korea. Subsection (h), the small-purchase exception, still reads $150,000 in the current statute.
The same law did act on textiles, in a different way. Section 865, "Improving the domestic textile and industrial base", directs the Defense Logistics Agency to develop a strategy to maximise the use of annual or multi-year contracts for acquisitions involving the domestic textile or footwear industries. It requires the Director of the Defense Logistics Agency to assess the domestic textile and footwear industrial base "not later than one year after the date of the enactment of this Act", including goods supplied to DoD by a single source.
Section 865 also asks for a plan to ensure that, not later than September 30, 2030, the Defense Contract Management Agency has the resources "to effectively oversee the compliance of the Department of Defense with section 4862". For suppliers, the direction of travel is more oversight and more predictable buying, not a lower bar.
The Berry Amendment exceptions
The exceptions are specific, and every one of them is something the government applies, not something a supplier can claim on its own behalf. The statute lists them in subsections (c) to (h); the DFARS restates them for buyers in 225.7002-2 and the clause repeats the ones that matter to contractors in paragraph (c). The ones most relevant to apparel and textiles are:
| Exception | Where | What it means for textiles and apparel |
|---|---|---|
| Domestic non-availability | 4862(c); DFARS 225.7002-2(b) | Applies where US items of satisfactory quality and sufficient quantity cannot be acquired as and when needed at US market prices, as determined by a listed official |
| Small purchases | 4862(h); DFARS 225.7002-2(a) | $150,000 in the statute; $200,000 in the DFARS since 1 October 2025 |
| Nonavailable articles list | DFARS 225.7002-2(c); FAR 25.104(a) | Includes flax, jute, sisal, hemp yarn, modacrylic fiber and silk, raw and unmanufactured |
| Incidental natural fibres | DFARS 225.7002-2(j) | Cotton, other natural fibres or wool worth not more than 10 percent of the end product price and not over the small-purchase threshold |
| Fibres and yarns for non-textile end products | DFARS 225.7002-2(m) | Fibres and yarns for synthetic fabric used in an end product that is not a textile product, but not the fabric itself; also para-aramid fibres and yarns from a qualifying country |
| Chemical warfare protective clothing | 4862(e); DFARS 225.7002-2(n) | When the acquisition furthers an agreement with a qualifying country |
| Combat operations and vessels | 4862(d); DFARS 225.7002-2(d), (h) | Acquisitions outside the United States in support of combat operations, and acquisitions by vessels in foreign waters |
| Commissary resale | 4862(g); DFARS 225.7002-2(i) | Items bought specifically for resale in commissaries (seafood from a covered foreign country excluded since the FY2026 NDAA) |
Two of these deserve a closer look. The nonavailable articles list in FAR 25.104(a) is a Buy American list, but DFARS 225.7002-2(c) carries it into Berry. For textiles it includes "Fibers of the following types: abaca, abace, agave, coir, flax, jute, jute burlaps, palmyra, and sisal", as well as hemp yarn, modacrylic fiber, and "Silk, raw and unmanufactured". That is narrower than it looks: it covers the raw material named, not every product made from it.
The incidental-fibre exception is also narrow. It applies only to cotton, other natural fibres or wool, only when their value is not more than 10 percent of the total price of the end product, and only when that value does not exceed the small-purchase threshold. It is not a general 10 percent allowance for foreign content in a garment.
Domestic non-availability determinations
The availability exception is the one that changes markets. Section 4862(c) says the restriction does not apply "to the extent that the Secretary of Defense or the Secretary of the military department concerned determines" that US items of satisfactory quality and sufficient quantity "cannot be procured as and when needed at United States market prices."
The DFARS names who may make that call, "without power of redelegation": the Under Secretary of Defense (Acquisition and Sustainment), the Secretaries of the Army, Navy and Air Force, and the Director of the Defense Logistics Agency. The supporting file must include a written certification by the requiring activity explaining, with specificity, why alternatives that would not need a determination are unacceptable.
The statute adds transparency. Under section 4862(k), when the availability or chemical warfare clothing exception is used on a contract for covered textile items, the Secretary must post a notice within 7 days after the contract award on the GSA contract opportunities site (FedBizOpps, or its successor).
The rayon example
Rayon is the standard illustration. According to the Congressional Research Service, Berry coverage of rayon used in flags and other military clothing and textile items "was waived in 2001" through a domestic non-availability determination, because rayon was domestically unavailable. The same report says market research "as recently as 2011" confirmed that rayon yarn and thread were still not available domestically. The lesson for suppliers is that a determination covers a specific item for a stated reason. It does not open the door to other imported inputs in the same garment.
Is there an exception for allied countries?
Only in narrow, named cases. The DFARS clause defines a "qualifying country" as one with a reciprocal defense procurement memorandum of understanding or international agreement with the United States, and lists them. For apparel, qualifying-country status matters in two places: chemical warfare protective clothing produced in a qualifying country, and para-aramid fibres and continuous filament para-aramid yarns manufactured in a qualifying country.
Outside those carve-outs, a covered item made in an allied country is still not a US item. Section 4862 also contains no general clause tying it to trade agreements, unlike the DHS rule discussed below, which must be applied "in a manner consistent with United States obligations under international agreements."
How the Kissell Amendment differs
The Department of Homeland Security has a similar but narrower rule, usually called the Kissell Amendment. It comes from section 604 of the American Recovery and Reinvestment Act of 2009 and is codified at 6 U.S.C. 453b. It bars DHS funds from buying covered items that are not grown, reprocessed, reused or produced in the United States, but only "if the item is directly related to the national security interests of the United States."
The covered list is textile-heavy: clothing and its materials and components; tents, tarpaulins, covers, textile belts, bags, protective equipment including body armor, sleep systems, load carrying equipment, textile marine equipment, parachutes and bandages; fibres, yarns and fabrics; and individual equipment made from them. It has a de minimis rule that lets DHS accept an item containing non-compliant fibres "if the total value of non-compliant fibers contained in the end item does not exceed 10 percent of the total purchase price of the end item."
Its small-purchase exception follows "the simplified acquisition threshold referred to in section 3205 of title 10", and it must be applied consistently with US obligations under international agreements. So the Kissell Amendment is not simply "Berry for DHS". Read 6 U.S.C. 453b and your DHS contract clauses on their own terms.
How Berry compares to Buy American and the Trade Agreements Act
The Buy American statute covers most federal supply purchases and uses a two-part test. Under FAR 25.101, a manufactured end product must be made in the United States, and the cost of domestic components must exceed 60 percent of the cost of all components, "65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029." The FAR also notes that the domestic content test has been waived for commercially available off-the-shelf (COTS) items.
Berry has no percentage. Covered items either meet the origin rule, including their covered materials and components, or an exception applies. The Congressional Research Service adds a second difference: Buy American applies only to federal contracts carried out within the United States, while the Berry Amendment, which is for defense contracts only, "is not limited to contracts within the United States."
The Trade Agreements Act works differently again. FAR 25.402 explains that, in acquisitions covered by the WTO Government Procurement Agreement, Free Trade Agreements or the Israeli Trade Act, the U.S. Trade Representative has waived the Buy American statute for eligible products, and "Offers of eligible products receive equal consideration with domestic offers." For a covered DoD textile buy, the starting point is still section 4862, which has no comparable trade-agreement waiver in its text.
In practice, a supplier who says its product is "Buy American compliant" or "TAA compliant" has answered a different question. Neither statement tells a DoD buyer whether the fabric, yarn and trims inside a garment are US-origin.
Berry and Made in USA labels
Berry is a procurement restriction enforced through DoD contracts. Made in USA is a labelling rule. The FTC's Made in USA rule, 16 CFR Part 323, says a product may only be labelled Made in the United States when its final assembly or processing happens here, all significant processing happens here, and all or virtually all of its ingredients or components are made and sourced here.
The two tests overlap but are not the same document, and one is not evidence of the other. A Made in USA label on a sample is a marketing claim; Berry compliance is shown with origin records for each covered material and component. Our guide to Made in USA clothing brands covers the labelling side in more detail.
Where the domestic textile base is
Because Berry reaches fibres, yarns and fabric, the mill is usually the constraint, not the sewing room. Federal data show how concentrated the mill side is. In 2025, North Carolina had 20,320 private textile mill jobs, Georgia 13,585 and South Carolina 10,932, out of 81,218 nationally, according to the BLS Quarterly Census of Employment and Wages. Those three states held about 55% of the US total.
If your fabric has to be US-made, the states in that chart are where most of the mill jobs sit, even when the garments themselves are cut and sewn somewhere else. Finding and vetting makers that can run a Berry programme is a separate subject, which we cover in its own guide; our overview of apparel manufacturers in the USA is a good place to start on the sewing side.
How suppliers document Berry compliance
Nothing in clause 252.225-7012 prescribes a form, so the practical question is what lets you show, item by item, that each covered material and component was grown or produced in the United States. Most suppliers build that file around a bill of materials:
- One line per input. Shell fabric, lining, interlining, thread, elastic, zippers, buttons, hook-and-loop, labels and packaging inserts, each with its supplier.
- An origin for every line. Where the item was grown or produced, backed by the supplier's written origin statement for that lot or order.
- Fabric traced upstream. For fabric, the mill's statement should cover the yarn and, for synthetics, the fibre, because the statute covers both.
- Exceptions written down. If an input relies on an exception, such as a nonavailable article or an incidental-fibre allowance, record which one and why.
- Version control. When a supplier or colour changes, the origin line changes with it.
A tech pack is the natural place for that origin column, because it already holds the bill of materials and the construction details a factory quotes from. We build a factory-ready spec for one style at $79, and an origin column can be part of its bill of materials when you ask for it. It documents what you specify; it does not certify compliance.
Questions to ask before you bid
If you are pricing a DoD apparel opportunity, these questions save time, and the answers should come with paper rather than reassurance:
- Is DFARS 252.225-7012 in the solicitation, and is the estimated value above the small-purchase figure in the DFARS?
- Which lines of the bill of materials are covered items, and does any exception in DFARS 225.7002-2 apply to a specific input?
- Can the mill state the origin of the yarn and, for synthetic fabric, the fibre?
- Who supplies thread, elastic, zippers and labels, and will they put the origin in writing for this order?
- Who in your company signs the compliance statement, and what records will they rely on?
None of this replaces reading the contract. Agencies also add their own specifications, and the clause list in the solicitation is what binds you.
Common questions
What is the current Berry Amendment citation?
10 U.S.C. 4862. It was renumbered from 10 U.S.C. 2533a by Pub. L. 116-283, with effect from 1 January 2022. The DFARS implements it in 225.7002 and the contract clause is DFARS 252.225-7012.
Does the Berry Amendment apply to other agencies?
The statute restricts funds available to the Department of Defense. The Department of Homeland Security has its own rule at 6 U.S.C. 453b, the Kissell Amendment, which covers items directly related to national security interests and has different exceptions.
What is the Berry Amendment threshold?
The statute exempts purchases of not more than $150,000 (US flags are treated separately) and forbids splitting a larger buy to get under it. The DFARS exception has read $200,000 since an inflation adjustment effective 1 October 2025.
Did the FY2026 NDAA remove the small-purchase exception?
No. The FY2026 NDAA, Pub. L. 119-60, amended section 4862(g) on seafood from covered foreign countries. A separate section ordered a Defense Logistics Agency assessment of the domestic textile and footwear base.
Does the Berry Amendment cover footwear and accessories?
Yes. DFARS 225.7002-1 says clothing includes outerwear, headwear, underwear, nightwear, footwear, hosiery, handwear, belts, badges and insignia.
Is Berry the same as Buy American?
No. Buy American uses a domestic component cost test, 65 percent for items delivered in 2024 through 2028 under FAR 25.101. The Berry Amendment has no percentage: covered items and their covered materials and components must be US-grown or produced unless an exception applies.
Does Berry apply to commercial sales?
No. It restricts DoD procurement. Selling the same garment to a retailer or consumer carries no Berry obligation, although the FTC Made in USA rule applies to how you label and advertise it.
OneAim places and manages production with 80 documented clothing manufacturers in the United States. Send the product, the quantity and your target date. Within 24 hours we reply, and we place the order with the US factory in our group that already makes it. Production, invoicing and shipping run directly between you and the factory. Flat fee, no mark-up.
Start my brief Get a tech pack ($79)References and data
- 10 U.S.C. 4862, Requirement to buy certain articles from American sources; exceptions, with amendment and effective-date notes. Legal Information Institute, checked November 2026.
- DFARS 225.7002-1, Restrictions, DFARS 225.7002-2, Exceptions and DFARS 225.7002-3, Contract clauses. Acquisition.gov, DFARS Change 5/7/2026, checked November 2026.
- DFARS 252.225-7012, Preference for Certain Domestic Commodities. Acquisition.gov, checked November 2026.
- Federal Register, DFARS: Inflation Adjustment of Acquisition-Related Thresholds (DFARS Case 2024-D002), final rule, 25 August 2025, effective 1 October 2025.
- Public Law 119-60, National Defense Authorization Act for Fiscal Year 2026, sections 831 and 865. GovInfo, checked November 2026.
- 6 U.S.C. 453b, Requirement to buy certain items related to national security interests from American sources; exceptions. Legal Information Institute, checked November 2026.
- FAR 25.101, General, FAR 25.104, Nonavailable articles and FAR 25.402, General (trade agreements). Acquisition.gov, FAC 2026-01, checked November 2026.
- 16 CFR Part 323, Made in USA Labeling Rule. eCFR, checked November 2026.
- 31 U.S.C. 3729, False claims. Legal Information Institute, checked November 2026.
- Congressional Research Service, "The Berry Amendment: Requiring Defense Procurement to Come from Domestic Sources", RL31236, via EveryCRSReport. Historical background; statutory references in the report predate the 2022 renumbering.
- US Bureau of Labor Statistics, Quarterly Census of Employment and Wages, annual averages 2025, private ownership, NAICS 313, 314, 315 and 3162 (United States and states), downloaded November 2026.
This article summarises public statutes, regulations and federal data as they read in November 2026. It is not legal advice, and it makes no claim that any particular supplier or product is Berry compliant. Reviewed and updated 20 November 2026 by Will Godax.
Related guides
- Made in USA clothing brands
- Apparel manufacturers in the USA
- Trims and labels for clothing brands
- Uniform manufacturing in the USA